2013-2017
In order to connect the new inner and out floor levels of the National Gallery we lifted the marble mosaic floor (originally laid in 1902) in 2013 and relaid it at the end of the renovation in 2016/2017. The floor was laid back at a slight angle avoiding steps and allowing easier access to the building.